Richard Lander Racing

Thursday 29 April 2010

It's Got Wheels!

This week has seen the arrival of the wheels and brakes from Bike Chain, allowing the rear subsection to be aligned and assembled, just needs a bracket for the callipers and it is pretty much there.

 The last few days has also seen work on the bonnet section with the main assembly yesterday and release from the jig today. Now it's free a hole for the driver can be cut and the silk/bioresin composite process can get under way. Then we can start to think about the finish we will give the whole body, most likely a hot coat of resin to get a nice glassy sheen, another technique lifted from the surfboard builders in the workshop nextdoor!
 It's the second team Friday tomorrow, so all the lads will be wearing their team hoodies instead of their regular uniform. Hopefully we can get organised enough for some pictures this time!

Thursday 22 April 2010

Back to Work

Work has resumed on the car after the Easter break, luckily none of the team is stuck overseas! Work continues on the drive chain with the addition of the sprockets and chain from HPC Gears, The gig used for the body has now been reworked into the gig for the bonnet section and the electronics for the autochanger have been prototyped and are ready for testing. With only 2 months to go to the heat however, we need to start getting a move on if we want to do any significant testing before hand.